A good estimate conversation should leave you with fewer unknowns. These ten questions are designed for a first call or site visit, with the answer to listen for and a record to keep. You do not need to know electrical terminology to ask them.
1. What business name and license number will be on my proposal?
Ask for the contracting company's legal name, not just the name on a truck. Compare it with the DPOR license record. Virginia's business licensing and individual trade credentials are separate. If the names differ, ask for an explanation before accepting.
Save: the business name, contractor number and date you checked. Request current insurance documentation and direct coverage questions to the insurance contact.
2. Is this a project estimate or a diagnostic visit?
Describe the desired outcome first. Installing a selected fixture is different from finding why several lights stopped working. Ask what the visit includes, whether investigation is billable, and how any further work will be authorized. A free project estimate does not mean open-ended fault finding is free.
Concerned About Your Home's Electrical Safety?
A professional electrical inspection identifies hidden hazards before they become emergencies. Our licensed electricians provide thorough safety inspections throughout Northern Virginia. Call (571) 444-6886 to schedule yours.
At AJ Long Electric: Estimates are free for every service. Scheduled estimate visits and written project prices are free. Diagnostic and repair work is a separately priced service. Diagnostics and repairs cost $195 for the first 30 minutes, then $60 for each additional 15 minutes.
3. What information do you need before visiting?
Provide the address, equipment model if selected, general location and a short description. For intermittent trouble, note when it happens and what was operating at the time. Send only photos you can take safely from an ordinary accessible position. Leave panel covers, fixtures and devices in place.
Save: your original request and any equipment specification you supplied. The circuit preparation checklist helps organize appliance and location details.
4. Which jurisdiction and permit process apply?
Ask the contractor to identify the authority for your actual address and scope. A mailing address is not enough to settle jurisdiction. Fairfax County's electrical permit guide also notes that some apartments and condos follow a commercial permitting path. Avoid assuming every home project uses the same application.
Save: who applies, who pays the included fees, who coordinates inspection, and where the record can be checked. The county recommends a properly licensed contractor obtain the permit as the responsible party.
5. What exactly is included, and what is excluded?
Have the proposal identify equipment, quantities, locations and the work needed to connect them. Discuss finish restoration explicitly: cutting an access opening, patching drywall and painting are different tasks. Ask who supplies fixtures or charging equipment and how a missing or incompatible part would be handled.
Save: the revised scope after the conversation. A note that says “as discussed” is less useful than a description someone else could understand.
6. How will changes be explained and approved?
Ask what happens if the planned route is blocked, concealed wiring differs from expectations, or the equipment choice changes. A useful answer explains when work pauses for a new decision, how the revised price is presented and who may approve it.
Save: the change procedure and every accepted change. Do not treat a general discussion of possibilities as approval for all additional work.
7. What access and outage arrangements should I make?
Discuss parking, locked rooms, shared spaces, pets and the route through finished areas. Tell the company if a power interruption affects medical equipment or another essential need so you can arrange an appropriate backup plan in advance. Ask which areas need to be clear and when the expected outage window will be confirmed.
Save: the preparation list and the contact who will confirm the visit. An estimated work duration is not a guaranteed restoration time.
8. Who will communicate with me during the project?
Ask for the person or office responsible for scope questions, arrival updates and approval requests. You should know how to reach the company if a decision comes up while you are away. For a multi-day project, agree on a reasonable update point.
Save: the contact method, your preferred contact details and who is authorized to approve changes. There is no need to guess how a company organizes its workforce to establish clear responsibility.
9. What are the payment and completion milestones?
Ask what is due at acceptance, during the work and at completion, and which events trigger those payments. Read the cancellation and equipment-order terms. DPOR's consumer guidance is a useful reference when reviewing the written agreement.
Save: milestone amounts, timing dependencies and the closeout list. Equipment installation, inspection and utility work may be separate events.
10. What workmanship coverage and follow-up will I receive?
Ask what work is covered, when the coverage begins and how to report a concern. Distinguish workmanship from the equipment manufacturer's warranty. For AJ Long Electric: Our quoted electrical installations include a five-year workmanship warranty from completion. Parts and equipment carry their manufacturer warranties. Membership enrollment does not change that installation warranty.
Save: the written terms, equipment model information and follow-up contact alongside your final project documents.
A short call summary to keep
| Before ending the conversation | Write down |
|---|---|
| The visit | Project estimate or diagnostic work; agreed pricing basis |
| The proposal | Included scope, exclusions and unanswered questions |
| The handoff | Who responds next, what you need to send and what has actually been confirmed |
For a booked work visit, ask how the dispatch fee and any time-based charges apply. The $99 dispatch fee applies when you book a technician to come out for work. It is waived for members and is never charged for an estimate visit or written estimate. Troubleshooting is priced separately.
AJ Long Electric has served Northern Virginia since 1996. You can request an estimate or diagnostic visit; staff review the request and confirm the next step. If you are comparing proposals, use the selection checklist to put each company's answers side by side.




