Residential project planning
A panel upgrade starts with the home's present electrical demand and the equipment it needs to support. The work can include panel replacement, load calculations, grounding and bonding updates, and permit and inspection coordination.

7138 Little River Turnpike #305, Annandale, VA 22003Our long-standing Annandale local presence — serving the Annandale community for over two decades.
Field briefing / Annandale, VA
Jurisdiction confirmed by property address
Scope first
Compare 100A, 150A, and 200A capacity against the calculated load and the homeowner's planned equipment.
Determine whether the panel can remain in place or needs relocation, and account for the condition of the service-entrance equipment.
Address-specific planning
An Annandale panel estimate needs to reconcile the home's current load with any layers of prior electrical work. The panel label and breaker count are only a starting point; service rating, conductor condition, grounding, and planned loads determine the useful upgrade scope.
Ravensworth, Woodburn, and Sleepy Hollow Woods include properties with varied renovation histories, so circuit labeling and accessible additions are checked rather than presumed. A panel behind finished walls or remote from the service entry can change access and relocation choices. Fairfax County Land Development Services provides the electrical permit and inspection process for the defined work.
Explore the Annandale service areaProject fit / review at the property
Local housing & wiring
Annandale panels in 1950s and 60s ramblers and split-levels in Ravensworth, Woodburn, and Annandale Terrace may be 60 or 100 amps, and some are Federal Pacific. AJ Long Electric checks the clearance first, since a water heater or furnace can end up in front of an older panel.
The ramblers and split-levels of Woodburn, Ravensworth, and Sleepy Hollow Woods were built with small panels placed wherever the builder found free wall space, and a half-century of basement work has built up around them. Ductwork, a water heater, a washing machine, or finished paneling can end up inside the working space code asks for in front of a panel. Replacing a panel in place when the clearance fails just repeats the problem, so we measure first and tell you whether the panel can stay or must move. Federal Pacific panels turn up in Annandale from the later 1960s, and 60 amp services show up in the oldest homes near Annandale Terrace. A 60 amp panel replacement is often limited by the service entrance behind it, so we determine whether the project is a panel swap, a panel plus service upgrade, or a relocation. Past owners also made unlabeled additions, so we trace every circuit before shutting down. Fairfax County Land Development Services issues the permit, and Dominion Energy schedules the disconnect and reconnect.
Quote inputs
Published planning range for defined 200A work: $3,500-$7,500 (200A); 400A quoted per project. The written Annandale proposal is project-specific.
Work sequence
Review the panel, service equipment, grounding, and the homeowner's goals.
Complete a load calculation and define the appropriate service capacity.
Confirm equipment location, scope, permit needs, and inspection steps.
Complete the approved electrical work, label circuits, and coordinate the required inspection.
Property-specific answers
Often the existing location can be used, but working clearance, moisture exposure, service-conductor routing, and access must be checked. If a condition prevents reuse, the relocation path is discussed before quoting.
It can. An addition from a past renovation may be fed from the main panel, from its own subpanel, or through a feeder that was extended later. We find where each addition gets its power and check that the breaker and conductors match before the scope is set. Any feeder or subpanel work is listed separately from the panel itself.
Code asks for a clear space in front of the panel of about thirty inches wide and thirty-six inches deep, with headroom, and the panel's dedicated space must stay clear above it. Water heaters, ducts, and shelves in that zone are common in Annandale basements. We measure on the visit and tell you what must move.
The power is off while the old panel comes out and the new one is connected, and any Dominion Energy disconnect adds to it. We agree on the window before the day, and we tell you in advance which circuits to protect, such as sump pumps or medical equipment.
Yes. We trace each circuit by testing and write a new directory. That takes time and is part of the scope. If we find unfamiliar splices, ungrounded cables, or doubled-up conductors, we note them in the estimate so the work is clear before it begins.
Related Services
Guides
Expert electrical guides to help you make informed decisions.
A comprehensive guide to electrical panel upgrades covering signs you need an upgrade, the process, costs, and what to expect.
A solar-ready panel is documented busbar capacity, backfeed space, and grounding — not modules on the roof. Plan it with EV and battery loads so you do not replace the panel twice.
Essential tips for maintaining your electrical panel, including what homeowners can safely inspect and when professional service is needed.
We also provide expert electrical services in these communities.
Next step / property-specific quote
Share the property address and project goal so the scope can be reviewed for your home.