Concept illustrationLoad Management vs 200-Amp Upgrade for an EV Charger
Compare EV load management with a service upgrade: charging needs, panel condition, available spaces, complete...

Property-specific electrical panel replacement and service-capacity planning, with load calculations, utility coordination, labeling, and permit-path confirmation. Trusted by homeowners throughout Montgomery County since 1996.
Replacing a worn or unsuitable panel, adding circuit spaces, and increasing the electrical service are different projects. AJ Long Electric evaluates the existing equipment and the loads your home needs before recommending one of them. We review the panel and service ratings, breaker compatibility, grounding and bonding, access, and visible damage. A load calculation helps determine whether a planned EV charger, kitchen appliance, HVAC change, or addition fits the existing service. The free written estimate identifies the equipment and work included, any required utility interruption, permits and inspections, and separate items such as branch-circuit corrections, relocation, or finish repairs. For a Bethesda property, the recommendation follows the actual equipment, access, electrical capacity, and project goals documented during the assessment.
On the same Bethesda street, one house can be a 1940s-60s brick colonial still running its original 100-amp service and the next a teardown-rebuild with a 200-amp service and every modern load. A Bethesda panel upgrade can be renovation-driven: the addition, the finished basement and the gut-renovated kitchen arrive together, and a mid-century service may not be able to carry them.
AJ Long Electric defines the panel replacements and upgrades scope for the individual Bethesda address. The written proposal identifies known conditions, access assumptions, included electrical work, exclusions, and any coordination that must be confirmed before scheduling. Before work begins, we confirm whether the defined scope requires coordination with the Montgomery County Department of Permitting Services; permit, inspection, and utility responsibilities are stated in the proposal for the address.
The core Bethesda neighborhoods, including Edgemoor, Alta Vista, Wood Acres and Bradley Hills, were largely built out in the 1940s through 1960s, and the homes that haven't been torn down and rebuilt still carry the electrical DNA of that era: 100-amp services (60-amp in the oldest sections), cloth-insulated branch wiring, and two-prong ungrounded circuits. Because so much Bethesda panel work rides along with an addition or whole-house renovation, we start with a documented load calculation covering the new HVAC zones, kitchen, EV charger, and finished lower level, then size the service accordingly. If the calculation supports 200 amps, the upgrade runs $3,500-$7,500; where an estate-scale renovation needs more, we quote a larger 320/400-amp metered service per job. Bethesda is unincorporated, so the electrical permit runs through the Montgomery County Department of Permitting Services (DPS), and we coordinate the Pepco meter pull so the cutover can be planned around the renovation schedule.

Our licensed electricians serving Montgomery County
AJ Long Electric documents the existing system before recommending panel capacity or equipment. The written scope distinguishes confirmed work from conditions that require access, utility input, or authority review, giving the homeowner a clearer basis for the decision.
Licensed & Insured
Since 1996
5-Star Rated
The proposed panel and service size follow a load calculation and the home's planned electrical use.
Circuit organization and labeling make the system easier to operate and maintain.
Visible damage, incompatible components, crowded wiring, grounding, and service-equipment conditions are addressed in the proposal.
Utility, permit, inspection, and outage requirements are confirmed for the address and defined work.
Future EV charging, HVAC, kitchen, or addition loads can be considered during design.
For panel replacements and upgrades at this Bethesda property, AJ Long Electric begins by reviewing the requested outcome, relevant equipment, safe access, and observed electrical conditions. The written proposal identifies the defined work, sequencing, coordination responsibilities, and exclusions. Authorized work is tested and documented to the completed scope; newly exposed conditions are discussed before the scope changes.
| Typical cost in Bethesda | $3,500-$7,500 (200A); 400A quoted per projectThe written estimate follows the defined equipment, access, routing, and coordination scope. |
|---|---|
| Typical timeline | Project-specific after service, utility, access, and permit review |
| Permit authority | Montgomery County Department of Permitting ServicesAJ Long Electric confirms the permit and inspection path for the address and states the included coordination in the written proposal. |
| Applicable code standard | NEC Article 408 & 250service equipment, panelboards, grounding & bonding (National Electrical Code, NFPA 70). |
| Most common local condition | Property-specific equipment, access, and electrical conditions are confirmed during the assessment. |
Permit fees, scope, and existing-condition surprises affect final pricing. Verify current requirements with the Montgomery County Department of Permitting Services and review the NFPA 70 (National Electrical Code).
We document the panel, service equipment, loads, grounding, breaker configuration, and visible conditions.
The recommended capacity and equipment follow the existing and planned electrical demand.
The estimate identifies included equipment, corrections, coordination, access, and exclusions.
Permit, inspection, outage, and utility requirements are confirmed for the address.
The approved equipment is installed, terminated, grounded, bonded, and labeled to the defined scope.
Connections and operation are checked, the directory is reviewed, and applicable closeout steps are completed.
When the documented load calculation for the finished house says so, not the square footage. We total the new HVAC zones, kitchen, EV charger and finished lower level the renovation adds. If the result fits within 200 amps, the upgrade runs $3,500-$7,500. If an estate-scale renovation needs more, a 320/400-amp metered service is quoted per project after review, and the Pepco service work is planned for that size.
Yes, early in the project. An addition, a finished basement, and a modern kitchen each add load a 1950s 100-amp service may not absorb, and the service has to be sized for the finished home's calculated load. AJ Long Electric runs a documented load calculation for the completed scope, upgrades to 200-amp service ($3,500-$7,500) before the rough-in wiring needs it, and handles the Montgomery County DPS permit and Pepco coordination as part of the renovation plan.
Answers to common panel upgrade questions are on our Panel Replacements & Upgrades page.
Typical Price Range: $3,500-$7,500 (200A); 400A quoted per project
Contact AJ Long Electric to request a written estimate for the defined Bethesda scope.
Our quoted electrical installations include a five-year workmanship warranty from completion. Parts and equipment carry their manufacturer warranties.
Discuss panel replacements and upgrades for your Bethesda property with AJ Long Electric. Call (571) 444-6886 or request an appointment online so we can confirm the project details and current scheduling availability.
Our licensed electricians are ready to assist you in Bethesda.
Request QuoteWe also provide panel upgrade services in these nearby communities.
Expert Resources
Explore practical guides for planning panel replacements and upgrades and understanding the available options.
Concept illustrationCompare EV load management with a service upgrade: charging needs, panel condition, available spaces, complete...

Not all electrical panels are created equal. Compare top panel brands including Square D, Siemens, Eaton, and more to...

Learn how panel grounding and bonding differ, where neutral and ground connect, and what to include in a professional...
Concept illustrationVirginia electrical permits explained: ordinary-repair exemptions, new wiring, owner applications, inspections, and...
Guides
Expert electrical guides to help you make informed decisions.
A comprehensive guide to electrical panel upgrades covering signs you need an upgrade, the process, costs, and what to expect.
A solar-ready panel is documented busbar capacity, backfeed space, and grounding — not modules on the roof. Plan it with EV and battery loads so you do not replace the panel twice.
Essential tips for maintaining your electrical panel, including what homeowners can safely inspect and when professional service is needed.
Navigate the electrical permit process in Northern Virginia with confidence. Learn requirements for Fairfax County, Arlington, Alexandria, and surrounding areas.
Related Services
Explore our other professional electrical services.
Home Level 2 EV charger installation with panel-capacity review, circuit planning, equipment connection, testing, and permit coordination for the defined scope.
Learn MoreProperty-specific branch-circuit installation for appliances, workshops, offices, and specialty equipment, sized to the connected load and existing panel.
Learn MoreInstall a compatible panel surge protector, replace an inactive device, or include protection with a panel project. We identify the equipment, connection work and any corrections in a written estimate before installation.
Learn MoreUpgrade your home's electrical service from the utility meter to the main panel.
Learn MoreRequest a property-specific review for panel replacements and upgrades in Bethesda. AJ Long Electric will confirm the relevant conditions, define the proposed electrical scope, and then confirm current scheduling availability.